NextInnovationAsia
1

Form No.1 - Factory Approval Plan Process.

• No site shall be used for the location of a factory or no building in a factory should be constructed, reconstructed, extended, or taken into use as a factory or part of a factory unless previous permission in writing is obtained from the Administrator or the Chief Inspector of Factories
• Application for such permission or submission of plans shall be made in Form No.1 in triplicate. It shall be accompanied by the following documents

Factory Plan Details

1. A flow chart of the manufacturing Process its Description including the chemical used, if any
2. Process and the steps proposed to be taken for effective removal of trade/Production wastes and A certificate from the Tamil Nadu Pollution Control Board proper arrangements made for the disposal of wastes
3. The site of the factory and immediate surroundings
4. After examination of the documents referred to in sub-rule (2), the Chief Inspector or Deputy Chief Inspector shall be signed and One copy shall be returned to the applicant


aussiejohn
663

This does not relate to a question regarding a HR problem or issue. Please find a more appropriate forum to ask these sorts of questions.
From Australia, Melbourne
Community Support and Knowledge-base on business, career and organisational prospects and issues - Register and Log In to CiteHR and post your query, download formats and be part of a fostered community of professionals.
This discussion thread is old and is closed for new comments. If you want to continue this discussion or have a follow up question, please post a new thread. Add the url of this thread if you want to cite this discussion.





Contact Us Privacy Policy Disclaimer Terms Of Service

All rights reserved @ 2024 CiteHR ®

All Copyright And Trademarks in Posts Held By Respective Owners.