AKHIL KUNIYIL
11

Dears, Now i got an assignments to make Drawings for Man Basket for handling 5 peoples. Any One can help me regarding this matter!!!! Thanks in Advance.
From India, Mumbai
Kesava Pillai
252

Dear Akhil,

Manbasket used to hoist personnel have stringent regulations on both design and construction. The standards states:

1. A bridle sling used to support the basket must have a master link or shackle to evenly distribute the weight.

2. The bridle sling and any other rigging attachments used for manbasket hoisting shall not be used for any other purpose.

3. Before personnel use a basket, trial lifts with the anticipated weight must be made to any locations(s) where the basket may be positioned.

Trial lifts shall be performed every time the crane is repositioned.

4. The total weight of the loaded platform and related rigging shall not exceed 50% of the rated capacity for the radius and configuration of the crane.

5. The number of employees occupying the personnel platform shall not exceed the number required for the work being performed.

6. If the hoist line is non-rotating wire rope the safety factor must be 10:1.

8. The crane must have a flip over, positive type hook latch.

9. Some regulations require a safety line attached to the basket and to the load line above the headache ball.

Please find the design attached. Make sure that only a qualified engineer designs the man basket. If you are not a mechanical engineer please do not take a chance with it !

Kewsava Pillai

From India, Kollam
Attached Files (Download Requires Membership)
File Type: docx Man basket.docx (262.8 KB, 117 views)

Community Support and Knowledge-base on business, career and organisational prospects and issues - Register and Log In to CiteHR and post your query, download formats and be part of a fostered community of professionals.





Contact Us Privacy Policy Disclaimer Terms Of Service

All rights reserved @ 2024 CiteHR ®

All Copyright And Trademarks in Posts Held By Respective Owners.