Dear Seniors, Can anyone help how to make a work order or if u can send me a format? Vishnu
From India, Hyderabad
Acknowledge(0)
Amend(0)

I don't know what is your purpose but i am sending you on which we made when we done AMC with one software company.
If you feel any further help required, please contact on
Warm Regard,

Attached Files (Download Requires Membership)
File Type: doc Work order format.doc (49.0 KB, 30633 views)

Acknowledge(10)
DE
AN
AC

+5 more

Amend(0)
  • CA
    CiteHR.AI
    (Fact Check Failed/Partial)-The user's reply does not provide a work order format as requested. It also includes an email address, which is not advisable for privacy reasons.
    0 0

  • Hi vishnu, Attached is the sample workorder format.
    From India, New Delhi
    Attached Files (Download Requires Membership)
    File Type: pdf WORKORDERFORM.pdf (24.8 KB, 11214 views)

    Acknowledge(2)
    AC
    Amend(0)
  • CA
    CiteHR.AI
    (Fact Check Failed/Partial)-The user's reply is missing the sample work order format. Please ensure to attach the format for a complete response.
    0 0

  • Want Work Order for Manpower Supply

    Queries:

    1. Job Contract (How to deploy manpower and their payment)
    2. 1-hour Job/once a month (Can the contractor deploy the same manpower working in another line activity but the work order is the same)

    From India, Patna
    Acknowledge(1)
    Amend(0)
  • CA
    CiteHR.AI
    (Fact Checked)-The user's reply contains valid queries related to job contracts and deployment of manpower under work orders. The questions are relevant for ensuring compliance and clarity in such arrangements. (1 Acknowledge point)
    0 0

  • Work Order Format for Manufacturing Setup

    Workforce Requirements

    Total Workers Required: [Number]
    Roles and Skills:

    Design Engineers: Skilled in mechanical design and drafting software.
    Fabrication Workers: Experience in metal cutting, welding, and machining.
    Assembly Technicians: Proficient in mechanical assembly and troubleshooting.
    Installation Crew: Skilled in on-site installation and alignment of mechanical systems.
    Quality Control Inspectors: Trained in inspection protocols and standards compliance.
    Maintenance Crew: Skilled in regular maintenance and troubleshooting of equipment.

    Safety Measures

    Safety Protocols and Measures:

    Personal Protective Equipment (PPE): Mandatory use of PPE such as helmets, gloves, safety glasses, and protective footwear.
    Emergency Procedures: Clearly defined emergency procedures and exit routes.
    Regular Training: Regular safety training sessions and drills for all workers.
    Health Checks: Routine health checks and monitoring for all employees.
    Safety Signage: Placement of safety signs and instructions across the facility.
    First Aid Kits: Availability of first aid kits and trained personnel for emergency medical assistance.
    Fire Safety: Installation of fire extinguishers, smoke detectors, and fire alarms.

    Contractor Details

    Contractor Name: [Contractor Name]
    Address: [Contractor's Address]
    Contact: [Phone Number, Email]

    Subcontractors (if applicable):

    Name: [Subcontractor Name]
    Address: [Subcontractor's Address]
    Contact: [Phone Number, Email]


    Acknowledge(0)
    Amend(0)
  • CA
    CiteHR.AI
    (Fact Checked)-The user's reply regarding the work order format for a manufacturing setup is accurate and detailed, covering essential aspects such as safety measures and contractor details. Well done! (1 Acknowledge point)
    0 0

  • Engage with peers to discuss and resolve work and business challenges collaboratively - share and document your knowledge. Our AI-powered platform, features real-time fact-checking, peer reviews, and an extensive historical knowledge base. - Join & Be Part Of Our Community.





    Contact Us Privacy Policy Disclaimer Terms Of Service

    All rights reserved @ 2025 CiteHR ®

    All Copyright And Trademarks in Posts Held By Respective Owners.