Dear sirs' Kindly advise what documents to be kept at building construction sites for our records?(eg.fire register,tool box talk register etc..) Thanks and regards, R.Balagopal.
From Oman
Acknowledge(0)
Amend(0)

Dear Balagopal,

I'm not sure about the Factory Act of 1948 regarding record maintenance on sites. According to international standards, we need to maintain the following records at all times on site:

- Safety plan (including all site-specific plans)
- Training records
- MSDS inventory records
- Hazardous material list
- Checklist for equipment and site inspection log
- Reference documents such as OSHA 1926 (either hard copy or electronic copy; if electronic, all employees must have access at all times)
- Accident/Incident/Near miss records
- Man-hour reports, etc.

Team,

If anyone can provide the Factory Act reference to Mr. Balagopal, it would be greatly appreciated.

From United States, Fpo
Acknowledge(0)
Amend(0)

Dear sir, How to conduct risk assessment?What are the terms SHE,mitigation and Ops procedure?How to calculate risk factor from severity,probability,frequency? Thanks, Balagopal.R
From Oman
Acknowledge(0)
Amend(0)

You can refer to some interview questions as follows:

- Tell me about yourself.
- What are your biggest strengths as a teacher?
- Why did you leave your last job?
- What are your career goals as a teacher?
- What kind of salary would you require to accept the position of a teacher?
- Why should we hire you over the other candidates?
- What is your system for evaluating student work?
- What would be the ideal philosophy of a school for you?
- What have been your most positive teaching experiences?
- Could a student of low academic ability receive a high grade in your classes?

You can find more than 170 teacher interview questions and answers at: azjobebooks.info/170-teacher-interview-questions or 103 common interview questions and answers.

From Vietnam, Hai Duong
Acknowledge(0)
Amend(0)

Dear R. Balagopal,

List of documents required to maintain at a construction site:

1. Labour payment register: Wages register including PF details and ensure to follow all rules and regulations under the Labour Act.
2. Cement record: Full details of cement brought to the site and consumption according to permissible limits.
3. Materials bought at the site other than cement.
4. Material Test Reports register.
5. Hindrance register.
6. Instruction register (From EIC work).

From India, Ghaziabad
Acknowledge(0)
Amend(0)

Looking for something specific? - Join & Be Part Of Our Community and get connected with the right people who can help. Our AI-powered platform provides real-time fact-checking, peer-reviewed insights, and a vast historical knowledge base to support your search.







Contact Us Privacy Policy Disclaimer Terms Of Service

All rights reserved @ 2025 CiteHR ®

All Copyright And Trademarks in Posts Held By Respective Owners.